User's Manual
5
3
IR Configuration
T2 will provide a configuration software for the IR configuration of M2e radios. The software
screen for configuration will appear as shown:
ComPort: The user will need to select the comport that is assigned to the L&G IR
module. Once the valid port is selected, the indicator light will turn green.
Enable Meter Pass Through / Get Data: This button will send the proper command to the
FOCUS meter to enable the pass-through and then forward the M2e
command.
The settings are the same as described in the RF section.