Instructions
Manual
= 10 Check balls
Main Body Repairs Connued (Front Side)
Page 3
Orange
New Scarf Ring
Original
Shi Slug
TCC Regulator
Original
Retainer
Original
End Plug
Discard Original
Valve and Spring
©TransGo 2019 02/12/21
Step 1
Discard original TCC Regulator Valve and spring. Clean the New TCC Regulator Valve
provided and test t it into the clean VB bore. If it moves freely, remove it and put a
small dab of assembly gel into the groove of the new valve followed by the NEW
Scarf Cut Ring. Now roll the small O-ring provided on top of the scarf cut ring and
place it in the freezer for 15 minutes. This will “size” the ring into the groove. Note:
The O-ring is only used as a sizing tool.
To install, roll the O-ring o the valve and set it aside. Insert the NEW Orange Spring
into the hollow end of the new valve and insert new valve and spring into the bore
while it’s sll cold, followed by the original Shi Slug, End Plug and Retainer. It will
go right in if the outer diameter of the ring is ush with the new valve.
Never force the valve in. Once you install the valve and ring– DO NOT REMOVE IT!