Brochure
Table Of Contents
69
Best Practices
I When installing a Transair
®
system, the work should be performed in accordance with good
engineering practices.
I Maintain a consistent level of good quality air by use of adequate filtration at the compressor
outlet.
I Never encase the network in order to facilitate maintenance or servicing.
I Bends and bypasses represent sources of pressure drop.
I To avoid excessive pressure loss, use modular consoles to offset the network and to bypass
obstacles.
I Keep in-line pipe diameter reductions to a minimum.
I The diameter of the pipe will influence pressure drop and the operation of point-of-use equipment.
I Select the diameter according to the required flow rate and acceptable pressure drop at the
points of use.
I Position drops as close as possible to the point of use.
INSTALLATION GUIDE