User Manual
Copyright © 1999 Sunstream Wireless, LLC All rights reserved.
1
1•Setup transceiver per instructions herein before installing outdoors.
2•Mount the articulated mounting arm to an earth grounded mast approximately 2.5 inches
in diameter. The pole must be securely mounted so that it does not move.
3• Install transceiver articulated mounting arm.
WARNINGWARNING
USE EXTREME CARE WHEN INSTALLING ANTENNAS NEAR POWER LINES.
4• Construct or puchase a shielded twisted pair (STP) cat 5 straight through 8 conductor
Ethernet cable terminated with shielded RJ45 connectors long enough to go along the pole
or wall to the building entry point. Use conduit and a drip loop as appropriate per National
Electrical Code.
6• Connect the cable to the unit and tighten the flange around the cable or conduit.
7• Install the junction box indoors near the entry point into the building. Plug the Ethernet
cable going to the transceiver into the ODU port (above the power input). Plug the wall
mount 20 V adapter or 24 Volt power source into the wall and then into the power input.
Verify that both LEDs come on solid after approximately 30 seconds.
8• Align the antenna for the coverage pattern desired. The elevation beamwidth is 10
degrees and the azimuth beamwidth is 60 degrees.
9• Tighten all nuts and bolts down after the alignment is completed.
10• To help protect against potential lightning damage, use an ethernet lightning surge
arrestor in line with the STP cable at the entry point to the building.