Installation and Maintenance Manual

Trane optimizes the performance of homes and buildings around the world. A business of Ingersoll Rand, the
leader in creating and sustaining safe, comfortable and energy efficient environments, Trane offers a broad
portfolio of advanced controls and HVAC systems, comprehensive building services, and parts. For more
information, visit www.Trane.com.
Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice.
We are committed to using environmentally
conscious print practices that reduce waste.
Stealth,Trane and theTrane logo are trademarks or registered trademarks of Trane in the United States and other countries.
9. Heaters
If unit was factory charged (model number digit 15 = 1), energize heaters for 24 hours prior to start up.
Important: It is required that chiller heaters are energized for a minimum of 24 hours prior to start up.Therefore,
chiller should have power for this amount of time beforeTrane Service arrives to do start-up.
If unit has nitrogen charge (model number digit 15 = 2), contactTrane Service for unit charging prior to start-up.
Important: Do NOT apply shore power to unit with nitrogen charge. Shore power will drive EXV valves, inhibiting
ability to adequately vac and charge unit.
10. Equipment room
Does the equipment room have a refrigerant monitor/sensor capable of monitoring and alarming within the allowable
exposure level of the refrigerant?
Does the installation have properly placed and operating audible and visual refrigerant alarms?
Does the equipment room have proper mechanical ventilation?
If it is required by local code, is a self-contained breathing apparatus available?
11. Owner awareness
Has the owner been fully instructed on the proper use of refrigerant?
Does the owner have a copy of the MSDS for refrigerant?
Was the owner given a copy of the Refrigerant Handling Guidelines?
Note: Additional time required to properly complete the start-up and commissioning, due to any incompleteness of the
installation, will be invoiced at prevailing rates.
This is to certify that theTrane
®
equipment has been properly and completely installed, and that the applicable items listed above
have been satisfactorily completed.
Checklist completed by: ______________________________________________________________________________________________
Signed: _____________________________________________________________________ Date: _______________________________
In accordance with your quotation and our purchase order number __________________, we will therefore require the presence
ofTrane service on this site, for the purpose of start-up and commissioning, by __________________ (date).
Note: Minimum two-week advance notification is required to allow scheduling of the chiller start-up.
Additional comments/instructions: ____________________________________________________________________________________
_____________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________
Note: A copy of this completed from must be submitted to theTrane Service Office that will be responsible for start-up of chiller.