Installation and Maintenance Manual
Warnings, Cautions and Notices
RTAE-SVX001B-EN 3
Factory Warranty Information
Compliance with the following is required to preserve the
factory warranty:
All Unit Installations
Startup MUST be performed by Trane, or an authorized
agent ofTrane, to VALIDATE this WARRANTY. Contractor
must provide a two-week startup notification toTrane (or
an agent ofTrane specifically authorized to perform
startup).
Copyright
This document and the information in it are the property of
Trane, and may not be used or reproduced in whole or in
part without written permission.Trane reserves the right
to revise this publication at any time, and to make changes
to its content without obligation to notify any person of
such revision or change.
Trademarks
All trademarks referenced in this document are the
trademarks of their respective owners.
Revision History
RTAE-SVX001B-EN (29 Oct 2014)
• Added transformer option.
• Added harmonic filter option.
• Added 150T and 165T single circuit units.
• Added extreme low ambient option.
• Added seismic isolation option.
• Added CE/PED option.
• Updated unit weights and isolator information.
• Updated drive cooling fluid volumes.
• Modified oil sump check procedure.
RTAE-SVX001A-EN (24 Sep 2013)
New release.
WARNING
Proper Field Wiring and Grounding
Required!
All field wiring MUST be performed by qualified
personnel. Improperly installed and grounded field
wiring poses FIRE and ELECTROCUTION hazards.To
avoid these hazards, you MUST follow requirements for
field wiring installation and grounding as described in
NEC and your local/state electrical codes. Failure to
follow code could result in death or serious injury.