Installation and Maintenance Manual
Table Of Contents
- Warnings, Cautions and Notices
- Model Number Description
- General Information
- Pre-Installation
- Unit Dimensions/Weights
- Installation - Mechanical
- Location Requirements
- Rigging
- Evaporator Piping
- Condenser Water Piping (RTWD Units Only)
- Refrigerant Relief Valve Venting
- RTUD Installation
- System Configuration
- Equivalent Line Length
- Liquid Line Sizing
- Discharge (Hot Gas) Line Sizing
- Example
- Refrigerant Charge Determination
- RTUD Chilled Water Flow Control
- Oil Charge Determination
- Outdoor Air Temperature Sensor Installation Requirements
- Fan Control for the Remote Air Cooled Condenser
- RTUD Condenser Elevation Setting
- Shipping Spacers
- Installation - Electrical
- RTWD/RTUD Operating Principles
- Controls Interface
- Pre-Start Checkout
- Unit Start-Up Procedures
- Unit Shutdown
- Service and Maintenance
- Diagnostics
- Wiring Schematics

RLC-SVX09H-EN 5
Compressor Rotor Oil Supply ........ 130
Compressor Bearing Oil Supply ...... 130
Oil Separator ...................... 130
Compressor Loading Sequence ...... 130
Controls Interface ...................... 131
CH530 Communications Overview ..... 131
Controls Interface .................... 131
DynaView ........................ 131
Display Screens ................... 132
Main Screen ...................... 133
Chiller Operating Mode ............. 133
Settings Screen ................... 138
Lockout Screen ...................... 143
Power Up and Self Tests .............. 144
TechView ........................... 145
Fan Configurations ................. 163
A/C Fan Controls ................... 163
Low Ambient Fan Control Type ...... 164
Fan Deck Arrangement Circuit 1 ...... 165
Fan Deck Arrangement Circuit 2 ...... 166
Example for Fan Configurations ...... 166
A/C Fan Controls (ACFC) ............ 166
Pre-Start Checkout ..................... 168
Unit Voltage Power Supply ........... 169
Unit Voltage Imbalance ............. 169
Unit Voltage Phasing ............... 169
Water System Flow Rates ........... 170
Water System Pressure Drop ........ 170
Unit Start-Up Procedures ............... 171
Sequence of Operation ............... 171
PowerUp ........................ 171
Stopped to Starting: ................ 173
Start-up ............................ 177
Seasonal Unit Start-Up Procedure ..... 177
Unit Shutdown ........................ 179
Normal Shutdown to Stopped ......... 179
Seasonal Unit Shutdown ............. 180
Service and Maintenance ............... 181
Overview ........................... 181
Maintenance .........................181
Weekly Maintenance and Checks ......181
Monthly Maintenance and Checks .....181
Annual Maintenance ................181
Scheduling Other Maintenance .......182
Operating Log ........................182
Service Procedures ...................185
Cleaning the Condense (RTWD Only) . .185
RTUD Air Cooled Condenser Applications -
High Condenser Pressure Limit and High
Pressure Cutout Diagnostics ..........188
Cleaning the Evaporator .............189
Compressor Oil ....................189
Refrigerant Charge ..................191
Freeze Protection .....................192
Diagnostics ............................193
Starter Diagnostics ...................194
Main Processor Diagnostics ............197
Communication Diagnostics ...........208
Limit Conditions ......................214
Wiring Schematics ......................215
Unit Electrical Data ...................215