Installation and Maintenance Manual

Table Of Contents
Warnings, Cautions and Notices
RLC-SVX09H-EN 3
Factory Warranty Information
Compliance with the following is required to preserve the
factory warranty:
All Unit Installations
Startup MUST be performed byTrane, or an authorized
agent ofTrane, to VALIDATE this WARRANTY. Contractor
must provide a two-week startup notification toTrane (or
an agent ofTrane specifically authorized to perform
startup).
Additional Requirements for Units Requiring
Disassembly
When a new fully assembled chiller is shipped and
received from ourTrane manufacturing location, and, for
any reason, it requires disassembly or partial disassembly
which could include but is not limited to the evaporator,
condenser, control panel, compressor/motor, factory-
mounted starter or any other components originally
attached to the fully assembled unit compliance with the
following is required to preserve the factory warranty:
Trane, or an agent ofTrane specifically authorized to
perform startup and warranty ofTrane
®
products, will
perform or have direct onsite technical supervision of
the disassembly and reassembly work.
The installing contractor must notifyTrane — or an
agent ofTrane specifically authorized to perform
startup and warrant ofTrane
®
products two weeks in
advance of the scheduled disassembly work to
coordinate the disassembly and reassembly work.
Startup must be performed byTrane or an agent of
Trane specifically authorized to perform startup and
warranty of Trane
®
products as noted above.
Trane, or an agent ofTrane specifically authorized to
perform startup and warranty ofTrane
®
products, will
provide qualified personnel and standard hand tools to
perform the disassembly work at a location specified by
the contractor.The contractor shall provide the rigging
equipment such as chain falls, gantries, cranes, forklifts,
etc. necessary for the disassembly and reassembly work
and the required qualified personnel to operate the
necessary rigging equipment.
Introduction
This manual covers the installation, operation and
maintenance of RTWD and RTUD units.
Revision Summary
RLC-SVX09H-EN
The following points describe the changes to this revision
of the manual:
Added factory warranty information.
Corrections to Model Number descriptions.
Updated unit dimensions and weights.
Added Recommended Glycol information.
Clarified requirements for liquid line service valves on
RTUD units.
Corrections to electrical data.
Updated Customer Wire Selection tables.
Corrected refrigeration circuit graphic in Operating
Principals chapter.
Updated Compressor Loading Sequence information.
Updated Diagnostics lists.
Removed electrical wiring diagrams, and added
reference to new wiring diagram document.
Miscellaneous minor corrections
Trademarks
Trane, Series R and theTrane logo are trademarks ofTrane
in the United States and other countries. All trademarks
referenced in this document are the trademarks of their
respective owners.