Catalogue

RLC-PRC029-EN 125
Dimensions
Table 65. RTWD – 50 Hz Dimensions – 130-250 ton HE, 160-200 ton PE
RTWD High Efficiency Premium Efficiency
130, 140, 160, 180
inch/mm
180
inch/mm
200, 220, 250
inch/mm
160, 180
inch/mm
200
inch/mm
A (2 pass evap)
132.9/3376 136.7/3472 136.7/3472 147.8/3755 136.7/3472
B (3 pass evap)
133.0/3378 136.7/3472 136.7/3472 150.8/3831 136.7/3472
C
75.6/1920 75.6/1920 76.9/1955 76.8/1950 76.9/1955
D
49.4/1256 49.4/1256 49.9/1267 49.4/1256 49.9/1267
E
21.5/547 21.5/547 21.5/547 21.5/547 21.5/547
F
10.4/265 10.4/265 11.2/285 10.5/267 11.2/285
G
32.7/830 32.7/830 33.1/841 33.8/860 33.1/841
H
42.4/1078 42.4/1078 43.9/1115 43.6/1108 43.9/1115
J (2 pass evap)
10.1/256 10.1/256 10.6/270 10.6/270 10.6/270
J (3 pass evap)
9.5/241 9.5/241 9.7/247 9.7/247 9.7/247
K (2 pass evap)
19.3/490 19.3/490 20.6/524 20.6/524 20.6/524
L (3 pass evap)
19.9/505 19.9/505 21.6/550 21.6/550 21.6/550
M
36.0/914 36.0/914 36.0/914 36.0/914 36.0/914
N
36.0/914 36.0/914 36.0/914 36.0/914 36.0/914
P*
40/1016* 40/1016* 40/1016* 40/1016* 40/1016*
R
114.8/2916 114.8/2916 114.8/2916 134.5/3416 134.5/3416
S
36.0/914 36.0/914 36.0/914 36.0/914 36.0/914
Reference
1
Evaporator Water Inlet
2
Evaporator Water Outlet
3
Condenser Water Inlet
4
Condenser Water Outlet
5
Power Disconnect
6
Power Wire
7
Control Wire
8
Control Panel
9
Condenser Return Waterbox End - Minimum Clearance (for tube removal)
10
Condenser Supply Waterbox End - Minimum Clearance (for maintenance)
11
Condenser
12
Evaporator
13
Panel Power Section [door swing 31.3 inch (796.9 mm)]
14
Panel Power Section [door swing 31.1 inch (790.1 mm)]
15
Panel Control Section [door swing 22.4 inch (568.14 mm)]
II
2 Pass Evaporator Unit
III
3 Pass Evaporator Unit
*
Control panel clearance is 36 or 40 inch (914 or 1016 mm) depending on voltages, starter type, unit application and local code;
42 inch (1067 mm) clearance required to other grounded parts; two units with panels facing each other or other live parts
require a clearance of 48 inch (1220 mm).