Installation Guide
TRAILER VALET RVR5 w/ MOUNT BRACKET
Quick Start Guide
Fit the Base Tower into the slot on
the top of the RVR and secure with
the four included screws. Install the
Mounting Joint on top of the Base
Tower and secure with Rotation Pin.
Check trailer height and ensure
installation is on a at surface.
Install the RVR Mounting Bracket
to the trailer frame. (at least 6
inches of clearance)
1. 2.
Turn on RVR by press the start/stop
button located on the front of the
RVR. Turn on the remote control by
pushing the forward button once
(hold for a few seconds)
3.
Use the remote to move the unit
towards the bracket socket.
5.
Install and secure the unit
utilizing the stow pin, and start
moving!
6.4.
Scan the QR code to access some helpful
videos to help you get started and
#MoveForward.
To use the RVR with a drill, read the manual for
step-by-step instructions. For supporting documents,
visit us at support.trailervalet.com.
NOTE: Make sure that unit is fully charged. First charge at least 6-8 hrs.
To start maneuvering,
simultaneously press and hold
forward/backward and right/left
buttons.
FRONT OF RVR REMOTE CONTROL
Check that you have all your parts and accessories.
RVR5 UNIT
BRACKET
SCREWS (4X)
REMOTE CONTROL
MOUNTING JOINT
BRACKET CLAMPS (2X) BASE TOWER
STOW PIN & COTTER PIN SECURITY BOLTROTATION PIN
MANUALBATTERY CHARGER
BRACKET BOLTS (4X)
6”