Installation Guide

1. Be sure the floor is clean and dry before installing underlayment.
2. Starting in a corner, install the first row of underlayment with the
non “lip and tape” side against the first wall and the overlapping
“lip and tape” side towards the open side of the room. The moisture barrier
must be facing up ward. Install the underlayment to the far wall and
cut around any obstacles using a utility knife. The “Easy to Cut” grid system
helps make this process easier.
3. Connect the second row of underlayment to the first row.
4. Seams should be butted together, leaving no gaps or overlaps.
5. Flip the first row’s overlapping lip over to the second row and secure it
to the top of the second row using the adhesive tape strip located on the
overlapping lip. To activate the adhesive just remove the
release liner and apply hand pressure to seal the seams. Repeat this process
until the entire floor is covered and sealed. It is not necessary to tape
the outer perimeter of the installation. Ensure that all foam seams
are sealed with metalized tape or underlayment seaming tape.
6. Install your floor per the flooring manufacturer’s instructions.
5-in-1 Installation Instruction

Summary of content (1 pages)