Installation Guide

TracRac Inc. 994 Jeerson St. Fall River, MA 02721 l 800-501-1578
Instruction Manual
Part 2 - Cross Bars
CROSSBAR ASSEMBLY
1. Pre-thread the all of the Button Head Cap Screw
(Item 13) into the at side of the Square Nuts
(Item 14) and set to the side. See Image A
2. Line up the assembled up rights in pairs as
they would be placed onto the truck - left and
right with the bases facing the same direction.
3. Take 2 of the BHCS/Square Nuts (with the
square nuts facing up) place one into each of
the slots of the upright saddle. See Image C
4. Take one of the Crossbars (Item 1) and ori-
entate the bar so that the bottom is facing
the oor. See Image B. Holding the bolts in
the slots of the saddle See Image C, slide the
square nuts into the bottom T-Slot of the cross-
bar. See Image D
5. Repeat Steps 1-4 with the opposite upright.
6. Repeat Steps 1-5 with the other pair
Image A
Image B
BOTTOM
TOP
Image D
Image C
Slots
14
13
Note the groves located on the bottom