User Manual

MN March22 www.tqbbrands.com.au Page 2 of 3
5. Open the pump inlet housing.
6. Twist the inner pump housing anticlockwise and remove from the main pump
body.
7. Pull the impeller from the main pump housing.
8. Install new impeller.
9. Reassemble the pump in the reverse order.
10. Install the pump to water tank and reassemble cooling pad, dust proof sheet and cooling pad fastening sheet.
11. Fill water tank to recommended level and test unit for operation.
The Evaporative Cooler should now be ready for operation. If the Evaporative Cooler continues to show the symptoms
as described above, please refer to a Qualified Service Technician or contact TQB Brands via
sales@tqbbrands.com.au
or 03 9357 8440.