Product Manual
SERIES 5100
TASKMASTER
INSTALLATION INSTRUCTIONS
CEILING HANGER BRACKET TASKMASTER SERIES
VERTICAL DISCHARGE AIR DELIVERY
MODEL V5105USE WITH 5102-5105 UNITS
MODEL V5120USE WITH 5107-5120 UNITS
MODEL V5150USE WITH 5125-5175 UNITS
MODEL V5105 IS FOR USE WITH 5102 THRU 5105 HEATERS.
MINIMUM MOUNTING DISTANCES FOR 5102 THRU 5105 HEATERS:
12” FROM CEILING AND ADJACENT SURFACES
7’ FROM FLOOR TO FRONT EDGE OF HEATER FRONT VENTURI
MODEL V5120 IS FOR USE WITH 5107 THRU 5120 HEATERS
MODEL V5150 IS FOR USE WITH 5125 THRU 5175 HEATERS
MINIMUM MOUNTING DISTANCES FOR 5107 THRU 5175 HEATERS:
18” FROM CEILING
24” FROM ADJACENT SURFACES
7’ FROM FLOOR TO FRONT EDGE OF HEATER FRONT VENTURI
1) Attach short angle brackets “A” to back of heater with four 5/16-18 bolts “B”, lockwashers “F”.
Be sure vertical leg of angle brackets face top and bottom of heater.
2) Attach inverted U frames “D” to short angle brackets with four 5/16-18 bolts “E”, washers “F”, lockwashers
“G” and nuts “H”, oriented as shown.
3) Attach long angle brackets “J” to inverted U frames “D” with four 5/16-18 bolts “K”, washers “L”, lockwashers
“M” and nuts “N”.
4) Attach heater and bracket assembly to ceiling in desired location using customer supplied hardware
sufficient to support the assembly.
FORM: 56620-004
ECO 1-5719
D
F
E
K
L
M
N
G
H
J
F
A
B