Installation Sheet

INSTALLATION PROCEDURE — LARGE COVER
4
1
3
2
Hex wrench
Control stop
NOTE:
The Flush Valves are preset for flush volume
as marked on the valve carton. The valve
does not require adjustment for variation
in water pressure within its operating
range.
14. To set the Flush Valve for proper
operation, open the control stop
completely and activate the Flush
Valve several times.
15. In the case of excessive flow rate
because of high water pressure,
gradually adjust the control stop
clockwise (towards the closed position)
until there is suitable water flow into
the fixture.
13. Before the supply water is turned on,
be sure all water leaks are eliminated
by tightening all the pipe connections.
NOTE: If for any reason it becomes
necessary to remove the control
stop make sure the water is shut off
at the main supply valve.
The control stop should never
be opened to the point where
the flow from the Flush Valve
exceeds the flow capability of
the fixture. In case of a valve
failure, the water must overflow
from fixture.
16. Tighten the front cover screws into
the base frame firmly with the hex
wrench.
Make sure no cord, wire or chain is
caught between the front cover and
base frame.
11. Connect the cables of infrared sensor
and controller with the connection
cable. ( , )
12. Connect the cables of manual button
and controller with the connection
cable. ( 3 , 4 )
1 2
3
4
9
ENGLISH
4
2
1
3