Installation & Assembly

3
ENGLISH
INSTALLATION PROCEDURE
1) Place the lavatory on the bracket and brace it ad-
equately so that the lavatory cannot tip over. Check
to make sure that the lavatory is installed at the cor-
rect height and is level, then mark the location of the
mounting holes in the lavatory (see Illustration 1).
N OTE: To help recall the lavatory position, trace a
line along the sides and top edge of the lavatory
with a pencil.
Remove the lavatory from the bracket. Drill the
remaining holes for the mounting bracket and install
the two remaining screws.
2) Install the faucets and drain (not supplied) per the
manufacturer’s installation instructions.
3) Return the lavatory into position with the marks on
the wall. Install the lavatory mounting hardware (see
Illustration 2). Place a metal washer onto a screw.
Insert the screw through a mounting hole in the lava-
tory.
NOTE: Do not secure the screw at this time.
Place the remaining metal washer onto the screw.
Insert the screw through the remaining mounting
hole in the lavatory. Level the lavatory with the mark
along the top and sides of the lavatory. Secure the
lavatory to the wall.
DO NOT OVERTIGHTEN. Overtightening
may damage the products and cause per-
sonal injury and/or property damage.
Refer to the rough-in guide for the location of the mounting bracket holes.
Use a pencil to mark the location of the screw hole that corresponds to the slotted
hole in the mounting bracket.
Drill a pilot hole for the wood screw.
Install the mounting plate to the wall using the bottom screw only.
Before Installation (continued)
Ill. 1
WARNING
Ill. 2
4) Connect the water supply to the faucet according to the faucet instructions. Connect
and tighten the trap to the drain. Turn on the water supplies to the faucet. Purge air
from the hot and cold water by running the water for a few seconds. Fill the lavatory
with water. Check for any leaks at the water supply and drain connections.