Technical Specifications

product data
Application:
The Surface must be dry and
free of dirt, oils, loose debris or
any substance that may inter-
fere with the bond. Replace any
damaged, fractured or warped
sections of sheathing with new
sheathing. Replace any wood
sheathing with splits greater
than 1/4” wide or with craters
greater than 1/4” deep and larg-
er than 2” in any lateral direction.
Total Stop RA is rst applied to
all sheathing joints and splits
with a trowel. Following the joint
treatment, the entire exterior
wall surface is coated with Total
Stop RA. Please follow the appli-
cation steps as outlined below.
Sheathing Joints: Open a
new pail of Total Stop RA and
mix with on low speed (500 rpm
maximum) with a jifer-style
paddle for 30 seconds. Avoid
over mixing or air entrainment of
the product. Using a steel trowel,
ll all sheathing joints with Total
Stop RA. Also ll any cracks,
splits, knotholes or craters in
the face of the sheathing us-
ing a trowel stroke of Total Stop
RA. ANY SHEATHING JOINTS
GREATER THAN 1/8” WIDE
SHALL BE BRIDGED WITH 6”
WIDE 2.5 OUNCE REINFORC-
ING SCRIM MESH EMBEDDED
WITH TOTAL STOP RA. ALL
SPLITS OR CRACKS IN THE
SHEATHING GREATER THAN
1/8” WIDE SHALL BE BRIDGED
WITH 6” WIDE 2.5 OUNCE RE-
INFORCING SCRIM MESH EM-
BEDDED WITH TOTAL STOP
RA. Allow curing a minimum
of 4 hours or until dry to the
touch before beginning coating.
Sheathing Face: Use a 1/2” nap
roller to apply a heavy 15-20 mil
wet coat of Total Stop RA to the
entire sheathing face. Cross-roll
the wet coating horizontally and
vertically to ensure complete
coverage. Allow the Total Stop
RA to dry and inspect the coat-
ing for pinholes or voids. If pin-
holes or voids are present, apply
a second coat of Total Stop RA in
an 8-10 mil wet thickness. Allow
coating to dry a minimum of 18
hours before proceeding with the
installation of any direct applied
exterior lamina or wall cladding
system such as EIFS (Exterior
Insulated and Finish System).
Handling and Storage
Do not apply to frozen or satu-
rated surfaces. Do not ap-
ply if precipitation is forecast
within 8 hours of application.
Do not apply if the temperature
cannot be maintained above
40F for 24 hours. Shelf life
in closed containers is 18-24
months when stored at 50-90F.
Flash point >200 F Seta
Density 8.9 lb/gal
Viscosity approx 30,000 cps
pH 9.2 - 9.8
Elongation 350 % ASTM D412
Actives 65%
Solids 57%
PVC 25.0% (calculated)
Moisture Vapor Transmission 15 perms ASTM E96
Resin Chemistry: Internally plasticized resin emulsions
Technical Data
Cleanup
Mask adjacent materials and tarp
horizontal surfaces below appli-
cation areas. Cover and protect
plants and sensitive vegetation
as necessary. Cleanup with wa-
ter or soapy water before drying.
Precautions
Total Stop RA is an alkaline wa-
ter based material. Do not in-
gest. Avoid contact with skin
and eyes. In case of contact,
ush with water. For contact
with eyes, get immediate medi-
cal attention in addition to ush-
ing. Wear safety glasses and
protective clothing. Keep out
of reach of children and pets.
Total Wall
888.702.9915 Phone
888.702.9916 Fax
www.totalwall.com