User Guide
4 Replacement Procedures 4.26 Fluorescent lamp
4-148 Satellite A40 Maintenance Manual (960-458)
Screw
Screw
Screw
(G)
Fit the pin and the hole.
Screw
Fit the pin and the hole.
Do not cover the
projection.
Fit the pin and the hole.
Fold the gate board.
Screw tightening torque: 0.9kg
•
cm
Fold the source board.
Check the condition after mating.
*Check the condition of the concave portion of
the FPC and the outline of the connector.
*Insert the FPC to the end. There shall be no
out of position in
θ.
*Lock surely the connector.
Poor mating: Failure
Out-of-position in θ: Failure
Figure 4-147 Replacing 15.0 Inch Sharp fluorescent lamp (SXGA+) (19)