Warranty
2
www.homewerksww.com
PRODUCT SPECIFICATIONS
SPECIFICATIONS SPECIFICATIONS
Min. ow rate: 2.4 GPM (9.1 LPM) at 20 PSI Ceramic cartridge
ASME A112.18.1/CSA B125
Manufactured to include no more than 0.25% weighted average lead
content on wetted surfaces
NSF 61-9
Oil rubbed bronze nish
ASSEMBLY INSTRUCTIONS
1.
Shut off water supply and remove old
faucet.
NOTE: Each valve stop should be
turned clockwise.
1
5.
Install the Middle Body:
Remove the preassembled
connector (1) from the middle body
(2). From underneath the sink,
place the middle body (2) through
the center hole in the deck. Replace
the connector (1) back on top of the
middle body (2).
NOTE: The middle body (1) must
turn to the direction as shown in the
diagram.
2
1
5
2.
Drill holes in the nished deck (not
included) per diagram.
NOTE: This kit is intended for
installations up to 2 in. thick.
8~16 in.
1-3/8 in.
1-1/8 in.
2
6.
Connect one end of each hose (1) to
the two connectors on the middle
body (2) and the other end of the
hoses (1) to the cold end valve (3)
and hot end valve (4). Gently bend
the hoses (1) to t in the available
space underneath the deck.
Tighten the nut (5) so that the ange
(6) sits ush to the surface of working
area. Repeat these steps for the hot
end valve (4). Securely tighten the
nut (7) with a wrench.
NOTE: The hot end valve is labeled.
5
1
4
3
2
7
6
I
6
3.
Remove the plastic caps (1) from the
cold end valve (2) and hot end valve
(3).
1
2,3
3
7.
Install the Handles:
Place the handle bases (1) over the
tops of the cold and hot end valves
(2, 3) and twist clockwise to secure.
Insert the handles (4) down through
the handle bases (1). Ensure that
each handle base is pointing away
from the middle body (5). Secure the
handles (4) with handle screws (6)
and tighten with a Phillips screwdrive
(not included). Insert the handle caps
(7) on top of the handle screws (6).
7
3
5
4
6
1
2
7
4.
Install Cold and Hot End Valves:
Remove the preassembled ange (1)
from the top of the cold end valve (2).
From underneath the deck, insert the
cold end valve (2) with the preas-
sembled rubber washer (3), metal
washer (4), and nut (5) through the
hole on the right side. From above,
thread the ange (1) onto the stem of
the cold end valve (2).
Repeat these steps for the hot end
valve (6).
NOTE: The hot end valve is labeled.
1
6
5
3
4
2
4
8.
Remove the preassembled screw (1)
and cap (2) from the faucet body (3)
and place the faucet body onto the
middle body (4). Then secure the
faucet body (3) with the screw (1) and
insert the cap (2).
3
1
4
2
8