Programming Guide
Getting Programmed
SitePro Central Control System
8
Setting Up Irrigation Programs (cont.)
For a quick review...
To see if stations are assigned, look at the run time displayed in the “n-time” column. If “A” is
displayed, the station run time is determined by the ET auto-calculation method. If the run time
is 0, then the station is not assigned. You can also run an Unassigned Stations report which lists
stations not assigned to a program or a Hydro-Link.
Troubleshooting tip: Check to see that you spelled the program name, area or site code exactly as you
entered it in the Control System Station set up screen.
➐ When you are done assigning programs and stations, go to the Water-Time Review Reports.
(Reports > Water-Time Review) Generate a report so you can review programs assigned to satellites
and verify run times. This is the best way to view that all programs have been assigned and that all
stations have been assigned.
9. Running a Projected Flow
Before you enter the remaining information (other groups, satellites, stations and programs) into SitePro,
you may want to verify that your first program operates as you expect it to. Do this by running a
projected flow.
• Highlight a source for the projected flow graph, and set the projected flow time and window.
• Click on the “Graph” button to display the report.
• When the flow update is in progress, you can view the text messages as it builds the irrigation cycle.
• Any errors are logged in on the Flow-log Report.
If you have programmed SitePro correctly, you’ll get a projected flow graph.
10. Completing Programming
After you have planned out your programs and successfully created the first program, you are ready to
complete your SitePro setup. If you need further help with setting up your central control system, or want
to take advantage of SitePro’s advanced irrigation features, refer to SitePro’s extensive on-line Help screens,
or contact the Toro National Support Network (NSN) at 1-800-527-4248.