User's Manual

16
II. Scheduled Watering
Start Times
Prog ET Toggle
Clear Schedule
Schedule Length
Run Days
Program Clear
Rain O Days
Assigned Sched
Water Window
Continuous Run
Repeat Dly (Delay) Time
Repeats
Percent Scale
Slot-Stn-Time
Schedule refers to the days of the week a program is set to run. Up to 16 unique watering day schedules can be dened in the
Sentinel Controller. Each schedule has a number assignment from 1 to 16. In the controller display, schedules are indicated by “S” and its two-
digit schedule number (01, 02,… 16). For example, Schedule 12 is shown as “S12.
Each schedule can be programmed as either a six week schedule or a 365-day calendar. Toro recommends that all schedule
programming through the faceplate be accomplished using 6-week schedules. Using a 365-day Calendar schedule requires the user to select the
irrigation status for every day of the year. (All days are default OFF.)
A schedule may have any combination of watering days and may be assigned to any of the sixteen programs (covered in the next section, Pro-
gram Setup). You must assign a schedule to a program to activate it. If using a 6 Week Schedule, the current Schedule Week was set in Time &
Day as part of controller setup (example was set to W1). When the controller reaches the end of a six-week schedule (W6), the program loops
back and starts again with Week 1 (W1).