Operator's Manual

Setup
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
Preparethemachine.
Connectormountbracket
1
7-pinconnector1
Bolt(5/32inches)
2
Spacer
2
2
Nut(5/32inches)
2
Installtheconnectorandconnector
mountbracket.
Relayandloaderarmharness1
Plugnut1
Grommet
Wireharnessretainer1
3
Screw
2
Connecttheloaderarmbranch.
Self-tappingscrew
2
Relay2
4
Fuse(5A)
1
Connecttherelayandpowerlead
connectors.
5
Nopartsrequired
Removetheexistinglever.
6
Nopartsrequired
Installthe4-in-1bucketlever.
7
Nopartsrequired
Installthevalvesolenoidharness.
8
Nopartsrequired
Testtheinstallation.
9
Nopartsrequired
Completetheinstallation.
Note:Retainallremovedpartsforlaterinstallation
unlessotherwisedirected.
Important:Youmustacquire2screws(5/16–18
TPI1.75inches)tocompletethisinstallation.
Important:Caporpluganydisconnected
hydraulichoses,tubes,orcomponentportsto
preventcontaminationenteringthesystem.
1
PreparingtheMachine
NoPartsRequired
Procedure
1.Installthebucket;refertoyourmachine
OperatorsManualforinformationoninstalling
andremovingthebucket.
Important:Alwaysusethetractionunitto
liftandmovetheattachment.
Important:Beforeinstallingthebucket,
ensurethatthemountplatesarefreeofany
dirtordebrisandthatthepinsrotatefreely.
Ifthepinsdonotrotatefreely,greasethem.
6