Operator's Manual
g244768
Figure8
1.Frontofthemachine4.Flush(shoulderofthe
strapreliefandthetank
strap)
2.Spraytank5.Gap(shoulderofthestrap
reliefandthetankstrap)
3.Tankstrap
3.Tightenthe4angedlocknutsand4boltsatthe
topofstrapsuntilthestrapsareushwiththe
surfaceofthetank(Figure7).
3
InstallingtheHose-Reel
Frame
Partsneededforthisprocedure:
1
Nut(1/4-20inch)
5
Flangenut(5/16-18inch)
12
Flangenut(3/8-16inch)
5
Bolt(3/8-16x1inch)
1
Bolt(1/4-20x3/4inch)
2
Bolt(3/8-16inch)
2
Bolt(3/8-16x31/2inch)
1Upperbracket
1Lower-bracketsupport
1Lowerbracket
1
Whizbolt(5/16-18x1inch)
1U-Bolt
2
Bolt(3/8-16x21/4inch)
1
Reel-shelfsupportbracket
4
Shoulderbolt
1
Reelshelfframe
2
Jamnut(5/16-18inch)
2
Bolt(5/16-18x1inch)
1Pressuregaugereducer
1
Coupler
1Pressuregauge
Procedure
1.Mounttheupperbracketusing1bolt(1/4-20
x3/4inch),1nut(1/4-20inch),1whizbolt
(5/16-18x1inch),and1angenut(5/16-18
inch)asshowninFigure9.
7










