Software Guide

g306628
Figure127
Incrementallyaddingproduct
1.Volumeofwaterinthe
tank(example:100.00
gal)
5.120.00galVolumeof
waterandproductinthe
tankplusanincrement
amountofproduct
(example:140.00gal)
2.Incrementamountof
producticon(example:
20.00gal)
6.Filltanktocapacityicon
3.Increasevolumeby
“VolumeIncrement”icon
7.Full(conguredtank
capacity—example:175
gal)
4.Volumeofwaterinthe
tankplustheincrement
amountofproduct(120.00
gal)
7.Ifyouarellingthetanktocapacitywitha
productorwater,youcanpresstheFILLTANKTO
CAPACITYicon(Figure127).
8.Presstheconrmiconandpresstheconrm
icononthetankllwindow.
ConguringtheSprayerControls
foraNewJob
StandardMode
SettingtheApplicationRateandNamingthe
Job
1.StartthemachineandkeepthekeyintheRUN
position.
2.Openthesprayer-controllericon(Figure128).
g031532
Figure128
1.Sprayer-controllericon
3.Inthesprayer-controllerscreen,determineifthe
correctpresetapplicationisset.
4.Iftherateisnotcorrect,changetherate
bypressingthepresetrateicons,pressthe
decreaseandincreaseiconstoincrementally
changetherate,orselectthecurrentrateeld
andentertheapplicationratewiththeon-screen
keypad(Figure129andFigure130).
g031494
Figure129
1.Currentrateeld
3.Decreaseandincrease
icons
2.Preset-rateicons
4.Sprayer-controllericon
52