Addendum

Form No. 3323-897
Model 38053—200000001 and Up
Installing the Discharge Chute
Addendum
English
Perform
this procedure after installing the auger/impeller
drive control linkage.
1.
Rotate the loose chute retainer on the bottom of the
chute outward (Fig. 1).
m–4113
2
3
4
5
1
Figure
1
1. Chute
2. Loose
chute retainer
3.
Fixed chute retainer
4.
Auger housing
5.
Chute ring
2. Lightly
grease the chute ring (Fig. 1).
3.
Lower the chute over the opening on the top of the
auger housing (Fig. 1).
4.
Ensure that the chute ring fits into the grooves in the
fixed chute retainers (Fig. 1).
5.
Rotate the loose chute retainer inward onto the chute
ring and secure it with a No. 10–4 x 5/8 inch (1.5
cm) screw (Fig. 2).
m–4114
1
2
3
Figure
2
1. Chute
retainer
2. No.
10–4 x 5/8
in. (1.5 cm)
screw
3. Tighten screw
6. Tighten
the other screw to secure the chute retainer
(Fig. 2).
Français
Ef
fectuer la procédure ci-dessous après le montage de la
tringlerie de commande de tarière/roue hélice.
1.
Ecarter vers l’extérieur le segment mobile de la
bague de retenue de l’éjecteur
, sous l’éjecteur
(Fig. 1).
m–4113
2
3
4
5
1
Figure
1
1. Ejecteur
2. Segment
de bague mobile
3.
Segment de bague fixe
4.
Carter de tarière
5.
Couronne d’éjecteur

Summary of content (4 pages)