Form No. 3444-838 Rev A ProLine H800 Rotary Mower Model No. 31051—Serial No. 321000000 and Up Setup Instructions Setup Loose Parts Use the chart below to verify that all parts have been shipped. Procedure Description Use Qty.
1 Removing the Machine from the Crate Parts needed for this procedure: 1 Mower deck 1 Machine 1 Hopper door Procedure 1. Remove the 4 planks that attach the mower-deck crate to the traction-unit crate. 2. Remove the mower deck crate (Figure 1). 3. Remove the hopper door from the crate (Figure 1). 4. Remove the front panel, plastic bags, and other packaging material. 5. Remove all the packaged machine components attached to the pallet. 6.
2 3 Installing the Hopper Door Installing the Latch Parts needed for this procedure: Parts needed for this procedure: 6 Flat washer 1 Hook 2 Bolt 1 Spacer 2 Locknut 2 Long bolt 1 Short bolt 3 Flat washer 1 Rod connector 1 Spring 2 Bushing 3 Flange nut 2 Locknut Procedure 1. 2. Remove the hardware from the brackets on the hopper. Install the hopper door to the hopper with the previously removed hardware; refer to Figure 2. Procedure 1. g315991 Figure 2 1. Hopper door 3.
g315987 Figure 4 1. Long bolt 5. Flange nut 2. Flat washer 3. Rod connector 4. Bushing 6. Locknut 7. Short bolt 4. Check the gap between the hook and the closed hopper door. Ensure that the gap is 2 mm (1/16 inch) and adjust if necessary (Figure 5). g316170 Figure 5 g315989 Figure 3 1. Long bolt 5. Locknut 2. Flat washer 6. Spacer 3. Flange nut 7. Hook 1. 2 mm (1/16 inch) gap 5. 4. Spring 2.
4 Installing the Rear Bumper Parts needed for this procedure: 1 Rear bumper 4 Bolt 8 Flat washer 4 Locknut 4 Cable ties Procedure 1. 2. 3. 4. 5. Remove the hardware from the rear bumper (Figure 7). Install the rear bumper under the hopper with the previously removed hardware (Figure 7). Connect the wire harness to the machine harness. Verify that the left and right turn lights are hooked up correctly by using the turn signal. If needed, change the connections.
5 Installing the Front Lights Parts needed for this procedure: 1 Front light assembly 2 Knob Procedure 1. Install the front lights onto the machine brackets by using the slots in the brackets (Figure 8). 2. Tighten the knobs (Figure 8). 3. Connect the wire harness to the machine harness. g316094 Figure 8 1. Front lights 2. Knob installed 6 3.
6 Positioning the Beacon Light No Parts Required Procedure 1. Raise the rollbar; refer to the Operator’s Manual. 2. Rotate the beacon light to the upright position and secure the fasteners. g316208 Figure 10 1. Warning decal—install over the existing decal 3. Existing decal 2. Spark-arrestor decal 4. Diesel fuel decal 8 Completing the Setup g316093 Figure 9 No Parts Required 1. Operating position Procedure Complete the setup instructions that are in the Operator’s Manual.
Countries ISO Language ISO Language ISO Language AI Anguilla GU Guam PR Puerto Rico AG Antigua and Barbuda GT Guatemala LC Saint Lucia, Saint Kitts and Nevis AR Argentina GY Guyana VC Saint Vincent, Grenadines BS Bahamas HT Haiti AS Samoa, American BB Barbados IN India SG Singapore Bz Belize IL Israel LK Sri Lanka BM Bermuda JM Jamaica SR Suriname BO Bolivia LB Lebanon TW Taiwan VG British Virgin Islands MY Malaysia TH Thailand BN Brunei MV Mald