Operator's Manual

ResetRegeneration
g214711
Figure40
Assist/reset-regenerationicon
Theassist/reset-regenerationicondisplaysinthe
InfoCenter(Figure40).
Thecomputertakescontroloftheintakethrottle
andchangesthefuelinjectionoperationto
increasethetemperatureoftheengineexhaust.
Important:Theassist/reset-regeneration
iconindicatesthattheexhausttemperature
dischargedfromofyourmachinemaybe
hotterthanduringregularoperation.
Whileoperatingthemachine,runtheengineat
fullenginespeedwhenpossibletopromoteDPF
regeneration.
The
icondisplaysintheInfoCenterwhile
theresetregenerationisprocessing.
Wheneverpossible,donotshutofftheengineor
reduceenginespeedwhiletheresetregeneration
isprocessing.
Important:Allowthemachinetocompletethe
resetregenerationprocessbeforeshuttingoff
theengine.
Note:Theresetregenerationisnished
processingwhenthe
icondisappearsfrom
theInfoCenter.
ParkedRegeneration
g214713
Figure41
Parked-regenerationrequesticon
Theparked-regenerationrequestedicondisplays
intheInfoCenter(Figure41).
Ifaparkedregenerationisneeded,theInfoCenter
displaysenginewarningSPN3719,FMI16
(Figure42)andtheenginecomputerderates
enginepowerto85%.
g213866
Figure42
Important:Ifyoudonotcompleteaparked
regenerationwithin2hours,theengine
computerderatesenginepowerto50%.
Aparkedregenerationrequires30to60minutes
tocomplete.
Ifyouareauthorizedbyyourcompany,youneed
thePINcodetoperformtheparked-regeneration
process.
PreparingtoPerformaParkedorRecovery
Regeneration
1.Ensurethatthemachinehasatleast1/4tank
offuel.
2.Movethemachineoutsidetoanareaawayfrom
combustiblematerials.
3.Parkthemachineonalevelsurface.
4.Ensurethatthetractioncontrolormotion-control
leversareintheNEUTRALposition.
5.Ifapplicable,lowerthecuttingunitsandshut
themoff.
40