Operator's Manual

Figure7
1.Pullframe
2.Pulllinkkit
Note:WhenmountingDethatcherUnitinright
frontpositiononGreensmaster32xxseriestraction
units,removecounterweightfromleftendofunit
andmountonrightend.Motortobeconnectedto
leftend.
A.InstallPullLinkKit,ToroPartNo.94-9630per
instructionssuppliedwithkit.
B.Adjustthereeldrivemotormountingscrewsso
approximately1/2in.ofthreadsisexposedon
eachscrew(Figure8).
C.Coatthesplineshaftofthemotorwithclean
greaseandinstallthemotorbyrotatingthe
motorclockwisesothemotorangesclear
themountingscrews.Rotatethemotor
counterclockwiseuntiltheangesencirclethe
mountingscrewsandtightenthescrews.
Figure8
1.Reeldrivemountingscrews
Operation
TrainingPeriod
Beforeoperatingthedethatchingunitsonagreen,
evaluatetheperformanceofthedethatcheratthe
desiredsetting.Operateinaclear,unusedareato
determineifthedesiredresultswillbeachieved.Adjust
thedethatcherifachangeisdesired.
Note:Whendethatchingunitsaremountedon
Greensmaster3200,3200–Dor3250–DTractionUnits
andareoperatedunderheavyloads,anadjustmentto
thecarrierframeandreelcircuitreliefvalvemaybe
required.Proceedasfollows:
AdjustCarrierFrameRollers
forGreensmaster3200,
3200-D&3250-D
1.Positiontractionunitonalevelsurfaceandlower
cuttingunitcarrierframestotheoor.
2.Loosenjamnutoncarrierframestopscrewand
rotatescrewtolowercarrierframerollersto
theground.Tightenjamnutafteradjustmentis
attained.
Figure9
1.Carrierframeroller2.Stopscrew
3.Whencuttingunitsarereinstalled,readjustcarrier
framestopscrewsothereis3/8"±1/8"clearance
betweencarrierframerollersandoor.
Checking/AdjustingtheReel
CircuitReliefValvePressure
Greensmaster32xxSeries(ModelNo.04380,04381&
04383)&Greensmaster3150(ModelNo.04357)
6










