Operator's Manual

2
Mounting the Spikers
1. Park the machine on a level surface, lower the lift arms,
stop the engine, and set the parking brake.
Note: If the carrier frames are equipped with single point
pull frames, the pull frame and attaching ball joint must be
removed (Fig. 3).
1
2
3
4
Figure 3
Greensmaster 3200 Only
1. Ball socket
2. Pull frame
3. Carrier frame
4. Roller sets
2. Slide the spiker unit in front of the traction unit pull
frame until the lift arm is positioned between the lift
pivot plates (Fig. 4).
4
2
3
1
Figure 4
1. Spiker lift pivot plates
2. Lift arm
3. Spacer
4. Lift roller
3. While pressing down on the lift arm, mount the lift
roller and the spacer to the lift pivot plates with a
3/8 x 2–1/2 in. capscrew and locknut (Fig. 4).
4. Mount the pull link assemblies to the Greensmaster
3200 and 3250 pull arms as follows:
A. Remove the screws securing the outside ends of
each anti-scalp roller shaft to each end of the carrier
frame (outside end of shafts only) (Fig. 3).
B. Assemble a jam nut and ball joint receiver onto each
pull link assembly as shown in Figures 5 and 6.
C. Mount a pull link assembly to each end of the
carrier frame with a spacer, washer, and screw
(Fig. 5 and 6). Make sure that the nylon bushing is
in the pull link.
D. Install a ball stud and lock washer to each end of the
spiker (Fig. 5 and 6).
E. Adjust the pull links all of the way forward and
tighten the jam nut.
F. Slide the sleeve back on each ball joint receiver and
hook them onto the ball studs (Fig. 5 and 6).
1
2
3
4
5
Figure 5
Greensmaster 3200 Shown
1. Pull link assembly
2. Ball joint receiver
3. Nylon bushing
4. Spacer
5. Ball stud (large diameter)
1
2
3
4
5
Figure 6
Greensmaster 3250 Shown
1. Pull link assembly
2. Ball joint receiver
3. Nylon bushing
4. Spacer
5. Ball stud (large diameter)