Installation Instructions
InstallingtheKit
g199808
Figure3
1.Nut(16mm)
9.Float-castingpivot
2.Washer(16mm)10.Bushing(30x20mm)
3.Pin(8mm)11.Bushing(25x25mm)
4.Greasetting12.Carriagebolt(M10x8.8mm)
5.Washer(10mm)
13.Roller
6.Hexnut(10mm)
14.Rightwing-headstop
7.Pin(25mm)15.Leftwing-headstop
8.Splitpin16.Bolt(M16x120mm)
Note:Theinstructionsbelowrefertotheconversionof
thecuttingunitfromaxedcongurationtoaoating
conguration.
Theremainingcuttingunitscanbeconvertedbyfollowing
thesameprocedure.
RefertotherelevantOperator’sManualforcuttingunit
installationinstructions.
1.Securetheoat-castingpivottothecuttingunitby
insertingthepin(25mm)throughthetaperedbushings
inthecutting-unitframeandtheappropriateholein
thecasting(Figure3).
2.Securethepin(25mm)inpositionwiththepin(8mm)
asshowninFigure3.
3.Installthebolt(M16x120mm),washers(16mm),and
nut(16mm)asshowninFigure3.
4.Tightenthefastenerssuchthattheoat-castingpivot
canfreelymovethroughitsfullrangeofmovement.
5.Replacethecuttingunitbackontothearmbyreversing
theremovalprocessdescribedpreviously.
6.Replacethe2frontcuttingunittransportrollerswith
the2rollerssupplied(Figure3).
7.Installthe2wing-headstopstotherelevantcutting
unitusingthecarriagebolts,washers(10mm),and
nuts(10mm)asshowninFigure3.
3




