Setup Instructions

6.Removethebeltguideanditshardwarefrom
thetractionunit.
Note:Retainremovedpartsforfutureusewith
arotarycuttingunit.
g243134
Figure2
1.Beltguide
7.Removethetopcoverontheailandthe
PTOengagementlinkagerodbeforeliftingand
movingtheailintopositionagainstthepower
unit(Figure3).
g243156
Figure3
1.Liftpoints
Note:Retainallremovedpartsforlater
installation.
2
InstallingtheAttachment
Partsneededforthisprocedure:
8
Bolt(3/8x1inch)
8
Curvedwasher
8
Flangenut(3/8inch)
Procedure
1.Install8bolts(3/8x1inch),curvedwashers,
andangenutstosecuretherotarycuttingdeck
tothepowerunitasshowninFigure4.
Important:Ensurethattheenginedeckis
paralleltotheail+/-0.5degreesbefore
tighteningthexingbolts.
g237289
Figure4
1.Bolt(3/8x1inch)3.Curvedwasher
2.Flangenut(3/8inch)
4.Reversedhardware
Note:Installtheboltsandwasherstogether
onthesamesideoftheframe.Thereversed
hardwareinstallswiththeboltendandnutfacing
outwards.
2.Torquetheboltsto30to35ft–lb(40to47N·m).
3.ScrewthePTOengagementlinkagerodintothe
powerunitbell-crankyokeandthenconnectthe
otherendtotheassistarmandsecureitwiththe
hairpincotter(Figure5).
2