Product Manual

Job Configuration Window
MAGNET Tools ver 1.0
16
- when a grid projection (in the Projection field
) is not
chosen (None and Localization is set) and a datum (in the
Datum field
) is not chosen, only Ground coordinate system
is available in the list.
- when a grid projection (in the Projection field
) is not
chosen (None and Localization is set) and a datum (in the
Datum field
) is chosen, Ground, WGS84 Lat, Lon,
Ell.H, WGS84 X,Y,Z, Datum Lat, Lon, Ell.H, Datum
Lat, Lon, Elevation
coordinate systems are available in the
list.
- when a grid projection (in the Projection field
) is chosen
(except None and Localization) and a datum (in the Datum
field ) is chosen, Grid, WGS84 Lat, Lon, Ell.H, WGS84
X,Y,Z, Datum Lat, Lon, Ell.H, Datum Lat, Lon,
Elevation coordinate systems are available in the list.
- when a localization is performed and / or grid to ground
transformation is activated,
Ground, Grid, WGS84 Lat,
Lon, Ell.H, WGS84 X,Y,Z, Datum Lat, Lon, Ell.H,
Datum Lat, Lon, Elevation coordinate systems are
available in the list.
Conclusion: To add Grid to the coordinate type list, select a
grid projection in the Projection field
. To add Ground to the
coordinate type list, select None or Localization in the
Projection field
.
and check box:
Grid - Ground
- if this check box is selected, the grid to ground
transformation is performed for the job. To select the desired
transformation method and set the corresponding parameters for
each method click .
Note: The check box is available when a projection (except
Localization and None) is chosen in the Projection
field.