Manual

-
ST4.
Use a small square to align the stab
TE
spar at rib
S2S
over the plan. Pin rib
S2S
over its
location on the plan with a T
-
pin about in front
of
the TE spar.
ST5.
Use the same method to align the
TE
spar
and pin the rest of the ribs on both sides of the stab
to your building board over the plan.
ST6.
Pin the fronts of the ribs to your building
board over the plan.
ST7
Add
botn
de
-
cut
1
8
"
balsa
elevator
LE
spars
(S8)
to
the assembly.
ST8.
Make sure all the jig tabs
of
all the ribs are
contacting your building board. Glue the stab TE
spar and elevator LE spar to the ribs with medium
CA. Don't use large amounts of CA or build up
fillets of glue. Later we will instruct you to reinforce
glue joints that don't
look
strong.
ST10.
Glue the die
-
cut
1/16
plywood
straight
tail
TE doubler
to
the front
of the
TE
brace (it's
the one with straight edges).
STI
1.
Add the center rib
S1
S
and glue it into
position.
ST12.
Sand the fronts of the ribs to match the aft
sweep of the leading edge. Cut two shaped
5/16
"
x
15
"
balsa
stab/fin leading edges
to a length of
13-314"
and bevel the joining ends to match the
plan. Glue them to the ribs and the LE joiner
so
the
top
is
even
with the
top
of the ribs. The bottom will
extend below the ribs but will be sanded flush later.
-12-
ST13.
Cut a
1/16
notch in center rib
S1S
behind
the LE brace. Test fit the die
-
cut
1/16
"
plywood
straight tail
LE
doubler
in the notch. Deepen the
notch as necessary
so
the top of the doubler is
even with the top of rib
SIS.
Glue the doubler
to
the LE brace and glue rib
S1
S
to
the doubler.
ST14.
Cut the end
off
both
SlAS
ribs at the
embossed line and set those little pieces aside.
They will be used later to glue the aft end
of
S1
AS
into position. Fit the to the elevator LE
spars, pin them
to
the plan, and then glue them to
the elevator LE spars.