Installation Guide
1
2
3
10/06/22 Rev.1.0
7
2.
See Fig. 2 for details.
Fig. 1
Fig. 2
Shower Door Installation
1. Prior to the Shower door installation, the installation of
the shower base and plumbing must be completed.
See Fig. 1 for details.
1
3
11
6mm
Install the wall jamb(11), to make sure the vertical installation.
1)Place the wall jamb(11) into the correct position and
mark the position of punch, using 6mm drill to punch.
2)Using the wall plugs (01) and screws ST4x35(03)
to secure them to the wall.