Instructions

26
8. Connection and installation
a) Function as a simple hoist
1
1
1
The cable hoist features 2 mounting brackets (1) that attach to a
rectangular beam. The beam must be the correct size for the mounting
brackets and must be able to carry double the rated load. To determine
the exact mounting parameters, contact a qualied technician.All
screwsmustbexedinplace.Beforeusingthehoistforthersttime,
askaqualiedtechniciantocheckthatthebeamisscrewedinplace.
b) Function as pulley
The cable hoist comes with a pulley (17) and a hook (18). When set
up correctly, the cable hoist can carry double the load at the same
motor power. The steel rope must be rated to carry the total load.
The pulley lifts the load using the steel rope. When used as a pulley,
the cable hoist can carry double the load. The mounting hook (10)
must be hung through the mounting hole (16) on the hoist housing.
Mount the pulley (17) and loading hook (18) as shown in the diagram.
Start by removing the loading hook (remove the three screws).
Place the steel rope over the roller, and then attach the roller to
the mounting hook and side components. Tighten the screws using
your hand. The rope must run smoothly between the pulley's side
components.