Installation Guide

Table Of Contents
Style
. Installation Size
Before installation, refer to the product installation dimension drawing to
determine the installation position.And pre-bury water pipes in the wall;
flush the pipes with scrubbing tools and install the faucet to remove mud
Sand, copper shavings, etc.
. Test method
1. Turn the faucet handle to the closed position, open the water inlet valve, and
check whether there is any leakage at all water inlet ports.
2. Open the faucet handle to the maximum, and open the water inlet valve to check
whether there is leakage at the water outlet and the sprinkler connection port.
3. Operate the reversing valve several times to check the shower water condition
and whether there is any leakage outside the connection.
4. If the water pressure is lower than 0.05M Pa (it is possible that the faucet drips
while the shower sprinkles water, or the faucet reversing valve does not work), a
booster pump should be installed in the pipeline.
25.59"
groundground
proposal:70.866"
25.59"
1/2-14NPT
12.849"
2.952"
2.952"
-5-
floor
G1/
2
30.837"
UN IT in
Style
. Cleaning Care
1. To keep the faucet bright and clean, please clean the faucet frequently or regularly. 2. Rinse only
with clean water, and dry the faucet with a soft cotton cloth.
3. Do not use detergents containing coarse particles such as decontamination powder or polishing
powder, nylon brushes, emery cloth or sandpaper to avoid abrasion of the product.
4. Do not use any acidic cleaning agent, or rough cleaning agent or soap to polish.
5. When the water flow of the faucet is significantly reduced, please clean the filter screen of the
shower head and the rubber particle hole of the shower water to avoid affecting the shower water or
blocking and bursting. Example: The flow of water out of the shower area is obviously reduced or
some rubber particles do not come out. Please scrub the shower rubber particles with your hands or
use a sewing needle (toothpicks) to pass through the shower rubber particle holes.
6. If a lot of cleaning work is required, please follow the following procedures:
a. Use clean water or a soft cloth to remove the dirt and scale film on the surface as much as
possible;
b. Use any of the following cleaning agents to remove surface dirt and scale film: □ Mild liquid
detergent.
Colorless glass cleaner, non-abrasive and completely dissoluble powdered cleaner (and mix
according to the manufacturing instructions)
Polishing fluid that is not suitable for abrasion;
Stubborn dirt can be bubbled with hot vinegar, then scrubbed with wax or toothpaste or with
Amway special hardware cleaner.
To remove stubborn water stains, you can use a fresh lemon slice to wipe the water stains
several times, or orange peel with sufficient water can also play a strong role in water stains. There
is no need to rub the orange belt color side vigorously, the stubborn stains on the faucet can be
used.
c. After cleaning, please use clean water to remove all the cleaning agent and dry it with a soft
cotton cloth.
. Installation Method
1. Wrap water inlet joint with the raw material tape and connect it with the water
pipe embedded in the wall .
2. A ttach to on the wall .the decorative cover water inlet joint
3. Measure the mounting position of the fixing seat according to the actual size
of the product. After making the mark, drill a hole on the wall and punch the self-
tapping rubber particles into the hole, then use the self-tapping screw to fix the
fixing seat on the wall, and then set it firmly On the decorative cover.
4. Insert the water knockout drum into the top shower pipe, adjust the position
it with a pole into the fixing seat on the wall, adjust the position and tighten it with
a hexagonal wrench , If the position is slightly misaligned when the product is
installed, the eccentric joint and fixing seat can be adjusted appropriately.
and tighten it with a hexagonal wrench, and then connect it with the water inlet
connector tighten it with a hexagonal wrenchthen insert the fixing seat on
water knockout rum to the fixing seat on the walladjust the position and tighten
25.59"
G1/2
proposal:70.866"
2.952"
1/2-14NPT
5.944" 25.59"
3.149"
15.9"
2.952"
floor
-6-
-4-