Installation Guide
Hinge pins
Hang the security door (B) on the hinges, holding the door open to a 90 angle
and starting with the bottom pin first.
Applied to
door panel
Applied to
hinge jamb
Shim washer
Determining Your Build Out Area (continued)Install the door
5
Reminder: Maintain annually. Apply
white grease to hinge pins. (Hinge pins
come pre-lubricated from factory).
Following the manufacturer's instructions, install your choice of 2-3/8" backset handle
and lock set (Sold separately). Fully extend the lock bolts into the "locked" position on
the security door (B).
Determining Your Build Out Area (continued)Attach hardware, door closer and windchain (sold separately)
6
Follow the manufacturer’s instructions
included with the wind chain and door
closer to install on your new security door.
Note: It is not required to use a wind
chain and door closer for your security
door.
Determining Your Build Out Area (continued)Prepare latch and deadbolt clearance
7
Mark for latch and deadbolt clearance BEFORE permanently installing the
lock-side jamb.
Hold the lock-side jamb (C) in place, making sure the top end of the jamb is butted
up against the top jamb. Use a level to ensure the jamb remains plumb, mark the
mounting holes E, F, G & H, and the latch and deadbolt holes. Remove latch-side
jamb and use the 1/2" Spade drill bit to drill clearance holes in center of latch
and deadbolt markings approximately 1/4" deep.