Instruction Manual

2
4. Installation
Remove the front of the unit by undoing the 4 bolt sremove the
bezel and lens with gasket.
Mark the position of the mounting holes on the wall using the unit
as a template.
Drill the holes for the wall plugs ensuring not to infringe with any
gas/water pipes or electrical cables that may be hidden below the surface.
Undo the cable gland sufficiently to allow the cable to be pushed through
the back.
Secure the supply cable into the luminaire through the hole(s) provided
ensuring that a cable gland, grommet or sealing compound is used
to maintain the IP rating of the luminaire.
Leave enough slack to allow for wiring, re-tighten the cable gland.
Fix the luminaire using the correct screws for the wall plugs installed.
Terminate the cable into the terminal block (see section 5 connection diagram)
ensuring correct polarity is observed and that all bare conductors are sleeved.
Secure the supply cable using the cable clamp.
Reposition the lens over the unit, taking care to ensure the gasket is in place.
Secure the lens and bezel back into place using the 4 bolts previously
removed at the beginning of the installation.