Installation Guide

Page 12
PRE-DRILL
DRIVE SCREWS INTO JOISTS
INSTALL PLUG
1
2
3
Pre-drill deck board with a 7/32”
drill bit
Using Setting Tool provided, drive
screw at medium or high speed until it
disengages at the proper level below
the deck surface.
Drive at one continuous speed,
do not slow down.
Install two screws into decking at
each joist
Maximum spacing between each row of
screws should be 16” on center.
Place plug into cored hole and
gently tap flush with deck surface
If mushrooming occurs, stop
installation and call customer service
at 1-800-307-7780
Cortex
®
Hidden Fastening System