Installation Guide

Page 6
INSTALL TOP RAIL
7
• Use optional End Coating
on exposed Top Rail
ends.
If your rail has stair sections, start installing the cap at the stairs. Wait until all
rail sections are complete before beginning Top Rail installation.
3/4”
1 1/2”
Top Rail Screw Placement
2’
2’
Pre-Drill 3/16”
#8 x 2 1/2” Coated
Screws
Pre-Drill 3/16” through
Universal Rail
Pre-Drill 9/64” through hole
in Universal Rail up into
Top Rail
#10 x 1 1/2” Coated Screws
Do not pre-drill into 4x4.
Installing Evolutions Rail
TM
Contemporary Style with Balusters