Installation Guide

Page 10
ATTACH RAILS TO
POSTS
8
• Position rail assembly
between Posts.
Screws are designed to go in at a slight
angle.
7
MEASURE AND TRIM
POST SLEEVES
• Mark where Top
Universal Rail meets
Bottom Post Sleeve.
• Remove Post Sleeve
and trim to stair angle.
Replace Post Sleeve.
• Use Post Sleeve to mark
the angle of cut on Post.
Remove Post Sleeve.
• Using a straight edge,
draw a line roughly 1/8”
below previous mark on
Post.
• Trim Post at lower line.
• Replace Post Sleeve.
• Replace both Post Skirts.
Pre-Drill 9/64”
#10 x 2” Coated
Screws
Installing Evolutions Rail
TM
Contemporary Style Stairs with Balusters