Installation Guide

Installing Evolutions Rail
TM
Builder Style Stairs
with Metal Balusters
Page 7
CUT POSTS AND
TEMPORARILY INSTALL
POST SLEEVES
1
2
MEASURE AND TRIM
BUILDERBOARDS
Position a BuilderBoard
on the stairs against the
Top and Bottom Post
Sleeves.
Mark the length and
angle at each post.
Trim the ends of the
BuilderBoard. Check
the fit at Top and Bottom
Rail locations, then trim
a duplicate BuilderBoard
for the Top Rail.
Min.
35 1/2”
Max. 8’
Must be Plumb
Trim post a min of 35
1/2” (for 36”) or 41 1/2”
(for 42”) above finished
deck surface.
Slide Post Sleeve over
4x4 Post. Do not force.
Posts may need to be
slightly taller for stairs.
Do not cut Post Sleeves in this step.