Installation Guide

Installing Evolutions Rail
TM
Builder Style with Glass Infill
Page 16
MARK AND CUT
POST SLEEVES
6
7
INSTALL BOTTOM
BUILDERBOARD AND BOTTOM
GLASS CHANNEL
• Replace Post Sleeves
and Skirts.
• Install Bottom
BuilderBoard by Pre-
Drilling through Brackets
with 9/64” bit and
attaching with provided
screws.
• Install Bottom Glass
Channel. Pre-Drill
through existing holes
and attach with screws.
• Mark the top of the Top
BuilderBoard on the Post
Sleeves.
• Slide Post Sleeves
off posts and cut to
appropriate length.
Post Sleeves should be flush with
the Top BuilderBoard.
Pre-Drill 9/64”
#10 x 2” Coated Screws
Pre-Drill 7/64”
#8 x 1” Coated Screws