Installation Guide

Page 10
MEASURE AND TRIM
BOTTOM POST AND
POST SLEEVE
7
8
INSTALL BOTTOM
RAIL, BALUSTERS,
AND TOP RAIL
Move Bottom
BuilderBoard into place
and secure. Pre-Drill
through Brackets with
9/64” bit.
Place Balusters onto
Baluster Connectors.
Mark where Top
BuilderBoard meets
Bottom Post Sleeve.
Remove Post Sleeve
and trim to stair angle.
Replace Post Sleeve.
Use Post Sleeve to mark
the angle of cut on Post.
Remove Post Sleeve.
Using a straight edge,
draw a line roughly 1/8”
below previous mark on
Post.
Trim Post at lower line.
Replace Post Sleeve.
Slide on Post Skirts.
For ease of connecting Balusters,
attach only 1 end of Top Builder-
Board and rotate down, fitting one
Baluster at a time.
Pre-Drill 9/64”
#10 x 2” Coated Screws
Installing Evolutions Rail
TM
Builder Style Stairs
with Metal Balusters