Installation Guide
Page 23
Installing AZEK Rail Stairs with CableRail by Feeney
®
Use a scrap piece of baluster trimmed at the 
stair angle as a guide.
Anchor posts should not exceed 60 feet apart 
during any continuous run of cable.
Installing Cable Installation Section
PRE-DRILL ANCHOR POST SLEEVE
1
11
Drill a through hole only in the 
post sleeve with a 1/4” drill bit at 
the same angle as the stair run
Scrap 
Baluster for 
drill angle
1/4”
1/8”
1/4”
1/8”
INSTALL TOP RAIL AND POST CAPS
• Position Top Rail over Support Rail and attach with screws.
• Secure Post Caps with exterior grade caulk.
Pre-drill 3/16”
#8 x 2 5/8” 
Coated Screws
Installing CableRail by Feeney
®
 Stairs for AZEK Rail










