Installation Guide
Page 20
Installing AZEK Rail Stairs with CableRail by Feeney
®
Pre-drill 7/64”
#8 x 3/4” Coated 
Screws
Center screw 
aligned with rail 
centerline
Pre-drill 7/64”
4
PREP BOTTOM SUPPORT RAIL
• Trim and Attach Foot 
 Blocks.
Pre-drill 7/64”
#8 x 3” Green 
Coated Screws
Pre-drill through 
Bottom Support Rail 
with 3/16” bit
Bottom Support 
Rail
#8 x 3” Coated 
Screws
• Attach Mounting Brackets to 
 Bottom Support Rail.
For sections up to 6’: Place one Foot 
Block in the center of the rail.
For sections 6’ to 8’: Space two Foot 
Blocks approximately at 1/3 intervals 
on the rail.
4
Brackets must be 
installed to the stair 
tread side of the rail.
5
INSTALL BOTTOM SUPPORT RAIL
•  Secure Mounting Brackets.










