Installation Guide
Page 15
Installing AZEK Rail with CableRail by Feeney
®
TRANSFER HOLE LOCATION ONTO POST SLEEVE
• Use an extra Intermediate Baluster, rested on the Bottom Rail, 
as a template for the CableRail Hardware and through holes.
8
• Using a 3/16” drill bit to transfer your marks onto the Post Sleeve.
TRANSFER HOLE LOCATION ONTO POST SLEEVE
• Use an extra Intermediate Baluster, rested on the Bottom Rail, 
as a template for the CableRail Hardware and through holes.
• Using a 3/16” drill bit to transfer your marks onto the Post Sleeve.
ATTACH TOP SUPPORT RAIL
9
INSTALL TOP RAIL AND POST CAPS
10
Pre-drill 
9/64”
#10 x 1” 
Coated 
Screws
#10 x 1” 
Coated 
Screws
a
b
Intermediate 
Base Plate
Support 
Rail
Intermediate 
Baluster
Pre-drill 3/16” 
#8 x 1 3/4” Coated 
Screws
b
c
Secure Post 
Caps with 
exterior 
grade caulk.
Pre-drill 7/64”
#8 x 3” Green 
Coated Screws
a










