Installation Guide
Page 13
CUT AND PREP BOTTOM RAIL AND TOP SUPPORT RAIL
INSTALL BOTTOM SUPPORT RAIL
• Position rail assembly onto Support Blocks.
5
4
6’ sections require 1 
Intermediate Baluster; 
8’ sections require 2 
Intermediate Balusters.
10’ sections require 3 
Intermediate Balusters.
#8 x 3” Green 
Coated Screws
#8 x 3” Green 
Coated Screws
• Cut to length.
• Attach Brackets to the Top Support Rail.
• Measure distance between the posts at the Bottom Rail and Top Support Rail.
Top Support Rail
Top Support Rail
Bottom Rail
Top Support Rail
Pre-drill 3/16” 
8 x 3/4” Coated 
Screws 
Use 
Intermediate 
Base Plate as 
template
Bottom Rail
#8 x 3” Green 
Coated Screws
#8 x 3” Green 
Coated Screws
Installing AZEK Rail with CableRail by Feeney
®










