Installation Guide
Page 12
Installing AZEK Rail with CableRail by Feeney
®
40” above deck surface is 
optimal for 36” railing heights.
If you do not have a the 
template, position
the top of the Support Block 4” 
above the deck. 
INSTALL LOWER 
SUPPORT BLOCK
• Position template at
 bottom of post 
sleeve above post 
skirt.
• Trim Post Sleeve to 
desired length.
INSTALL POST 
SLEEVE
• Slide Post Sleeve and 
Post Skirt over post 
(do not force).
• Ensure posts are
 square and plumb.
Optimal 40”
skirt.
45°
For angled rail installations 
- align angled face of Support 
Block parallel to rail section.
CUT AND ASSEMBLE BOTTOM SUPPORT RAIL 
•Cut the Bottom Support Rail to length.
3
1
2
Page 12
Straight Section
Angled Section
Center screw aligned 
to rail centerline
Center screw 
aligned to rail 
centerline
Bracket set 
fl ush to rail 
face
Bracket set 
fl ush to rail 
face
Center screw aligned 
Foot Block
7/64” Pre-drill
#8 x 3” Coated 
Screws
7/64” Pre-drill
#8 x 3/4” Coated Screws
1/2
1/2
For angled rail installations 
- align angled face of Support 
Block parallel to rail section.
4”
Template
Support 
Block
Post 
Skirt
7/64” Pre-drill
#8 x 3” Green 
Coated Screws
7/64” Pre-drill
7/64” Pre-drill
For sections up to 6’: Place one Foot 
Block in the center of the rail.
For sections 6’ to 8’: Space two Foot 
Blocks approximately at 1/3 intervals on 
the rail.
For sections 8’ to 10’: Space three Foot 
Blocks approximately at 1/4 intervals on 
the rail.










