Instructions / Assembly

7
inserted through slotted holes that are located just below the damper (N). The slotted holes are on all
four sides of the firebox. For maximum heat output, move the screws to the lowest position within the
slotted holes on all four sides of the firebox (this allows more fuel in). For use above 3,000 Ft. in
elevation be sure the firebox bottom is set at the lowest position in the slots.
Installing the Deluxe Fire Pot:
Insert (XP) the firepot into the square cutout on the firebox bottom. The 3/8” nut on the bottom of the
fire pot will face towards the rear of the firebox. Make sure the fire pot sits flush. Place the large
washer onto the pull rod. Insert the pull rod from rear and align with the nut on the firepot bottom.
Turn clockwise until tight. The pull rod should be pushed in during operation.
Step 3 - Assembling the ash pan: Place the (P) ash pan front (with the holes closer to the top) onto
the (O) ash pan. Insert two 1/4 x 7/8’’ screws into the (Q) ash pan handle. Position handle onto the
front of the ash pan with the screws going through the holes. Secure the screws on the inside with a
lock washer and a 1/4" nut each on the inside. Slide the completed ash pan into the front of the
firebox opening below the door opening.
Step 4 - Installing the Door Mounting Bracket and Door: Mount the (L) door mounting bracket to
(K) firebox using two 10/32 x ½” screws. The threaded portion of the door hinge will be in the top
position. Attach (M) Door to (L) Door mounting bracket using two ¼ x ½” screws. Twist on the spring
handles to the door latch and damper dial.
Step 5 - Installing the Stove Top Collar onto the Stove Top: Slip the stove top collar (A) up from
the underside of the stove top (B) through the center hole. The flange holes need to be aligned with
the holes on the stove top. Insert four 10/32” screws from the top into the holes on the center of the
stove top and fasten with four 10/32” nuts on the underside.
Step 6 - Installing the Stove Top: Place (B) stove top on top of (K) firebox with the beveled edge
facing down on the front of the heater. Secure with twelve 10/32” screws.
Step 7 - Attaching Hopper Handle and Shut-Off Key (mushroom shaped with wire loop): Place
the shut-off key loop around one handle. Using two 1/4 x 7/8” screws align the (Q1) hopper handle
with the holes on the backside of the hopper and secure them with a lock washer and a 1/4" nut for
each screw from the inside.
Step 8 - Installing the Hopper Heat Shield: Install (T) heat shield by sliding heat shield in between
the hopper and fire box so that the tabs are inserted into the slots located on the (G) and (H) hopper
brackets. Insert from top down.
Step 9 - Attaching the Spark Arrester to Top Reflector: First, bend the tabs on the top of the
spark arrestor 90 degrees out. Attach the (X) stove pipe spark arrestor (stove pipe piece with logo) to
the (Y) top reflector using three 10/32” nuts and 10/32” screws. Position over holes on the top
reflector and screw together.
Step 10 - Assembling Stove Pipe and Installing on Stove: Your heater comes with one plain
piece of stove pipe and one spark arrestor stove pipe. Place (W) stove pipe on the ground (on a
nonabrasive surface like carpet or rug). Start on the bottom end and gradually connect two sides of
the locking pipe. Attach one (W) stove pipe to (A) stove top collar with the crimped end up. It’s